Today Sean and I started on bringing the driveline together. We started by installing stator and the 32 amp charging system, including the voltage regulator and inner primary which connects the engine and transmission together. 
Sean started by assembling the engine side drive belt gear, while I started to line up the tranny and engine. At this point things are going pretty well, and if you are wondering what happened to Mr. Assembly? Well, after having to beat the swing arm bearings in, and other documented issues, he has been demoted to 3rd string for information. I was able to get the engine and transmission lined up and the inner primary installed with no issues.